Embracing BIM Across the Project Lifecycle
AG5, a small architecture practice based in Copenhagen, Denmark, specializes in simple, sustainable design. “That’s our main focus,” explained Brian Sheldon, a partner at AG5. “And by using technology-enabled processes, we’re able to maintain a consistent approach throughout the design process, from conception to construction – and deliver a unique design response to a project’s location and purpose.” The fi rm’s three partners and five full-time employees collaborate with a diverse range of clients, from private to institutional and governmental in Denmark and internationally. For AG5, design software is a means to an end: creating inspiring and sensory-stimulating spaces that customers love. “We employ BIM (building information modeling) at an expert level to ensure quality and precision in our work,” stated Sheldon. “And we do this using Bentley’s AECOsim Building Designer.” AECOsim Building Designer provides AG5 with a complete BIM solution by combining BIM applications for multiple disciplines in one single product that supports integrated workflow ...
... and high productivity. It allows companies to work on larger and detailed projects more easily, as they can enable large, distributed teams to work together efficiently.
Employing Federated Data Models
For AG5, one of the most important features of AECOsim Building Designer is its federated data model. Sheldon explained, “With Bentley, we can have one main data model for a given project and break it down into sub-models – for example, by floor, interior elements, exterior facade, steel framing, and so on – that different teams specialize in.” All of these sub-models can be worked on independently by experts and then referenced into a master model, regardless of the project’s size or complexity. In this way, everything related to an AG5 design project can be stored in a single, federated model – including work done by third parties using diverse design tools. “One of the reasons we like Bentley software is its interoperability,” noted Sheldon. “For example, when we started a project in Jakarta, Indonesia – the Gran Rubina, a 22-story office building – we worked on it jointly with an Indonesian partner interested in learning about Danish sustainability concepts and using BIM. There had been a lot of pre-work done before we even started the 3D modeling – a lot of analogs and 2D sketching on things like cores, elevators, and stairways, and even sketched-up 3D files.” The partner also had a large office with nearly 50 production people working full-time on CAD drawings. AG5 knew it was unrealistic to expect them to start using Bentley software – and they didn’t want any of their work to go to waste. So AG5 referenced their partners’ third-party files into the federated 3D model within AECOsim Building Designer. Referencing enabled AG5 to bring everyone’s work together into a single, complete model for clash detection, reporting, and other critical work. “Bentley software allows us to reference those files into our 3D files,” stated Sheldon. “They’re not directly used, but someone can continue to work in a 2D environment, and we can reference their work into our 3D environment, and have everything up to date until we’re ready to take it over to a fully 3D environment.”
Creating 2D Views and Drawings from 3D Models
With all of the information for the Gran Rubina project synchronized and reflected in a single, federated data model, AG5 was able to use it as the basis for reporting, dynamic views, sheets, and more. “From a 3D model, we can take dynamic views – which are 2D views of the 3D model – and do further detailing of the design,” explained Sheldon. “Or we can translate them to 2D format so collaborators using other tools can detail them. We have no problem bringing designs into a 2D environment if that makes sense from either a workflow or cost perspective.” Equally important, AG5 can keep an on eye on the work completed by people doing the detailing. “The referencing process is completely dynamic,” noted Sheldon. “It’s a kind of live system that can maintain cross-references, which is important because there’s a lot of detailing going on. From there we go to sheets and scale drawings, where we mainly do dimension and some other annotation, and then, of course, to issue documentation.” Cross-referencing also ensures that as changes are made in files referenced into the 3D model, the 3D model itself is automatically updated. “Everything in the system is completely live, so if anyone updates one thing, it gets updated through the whole federated data model,” noted Sheldon. Equally important, AG5 can pull all three files – the 3D model, the 2D view of it, and the sheet – with ease. “These files are all hyperlinked, which enables us to navigate between them. And because AECOsim Building Designer knows which files are associated with any cut we make through a design, we can, for example, bring the annotation up into the 3D model if we want to.” Using Interoperability for Faster Collaboration AG5 regularly leverages the interoperability supported by AECOsim Building Designer to facilitate better, faster collaboration – both internally and externally. For example, while working with a steel manufacturer on the structural model of a small school, AG5 designers initially modeled the steel with input from their engineers. Eventually, the steel manufacturer took over the responsibility of modeling the steel. “They used our model as a basis. We simply exported our file to IFC, and they worked on it,” commented Sheldon. “When it came back, we were able to pull their IFC model directly into our federated data model to perform a visual inspection and run crash detection testing. The steel manufacturer’s model became the basis for AG5’s sections and drawings.” In another instance, AG5 entered a competition in New York for a residential steel tower. They had a collaboration already in place with Ramboll in London, so they chose to enter this competition together. But Ramboll’s designers were used to using a third-party parametric software. “Rather than trying to get them to use what we use, we set up a workflow to model the design using their parametric software and exported the file to Bentley software,” stated Sheldon. “By exporting their BIM elements through a plug-in, they were recognized as BIM elements within Bentley, which was actually quite cool. The result was a good workflow going back and forth.”
Add Comment
Real Estate and Foreclosure Articles
1. Land Clearing Services: Reducing Fire Risks And Promoting SafetyAuthor: Texas Ace Land Clearing
2. Leading Construction Company In Karimnagar - Raichandani Sindh Developer
Author: RaichandaniSindhDevelopers
3. A Step-by-step Process For Selecting The Most Suitable Property Management Company
Author: sahasra
4. Discover Tierra Iii: Your Dream Villa Plot Awaits In Oragadam
Author: Dishant
5. Purvanchal Skyline Vista Noida - Modern Retail Shops & Offices
Author: commercial noida
6. Is It Possible For Sellers To Refuse To Pay A Buyer’s Agent In Atlanta
Author: Diamond Equity Investments
7. Industrial Spaces In Chennai : San Logistik Park
Author: SAN Logistik Park
8. Building On A Budget: Tips From Uk Builders
Author: Caroline Gomez
9. Common Inquiries Landlords Have On Property Management Services
Author: sahasra
10. What Can You Expect If You Live In Ultra-modern Flats?
Author: Saurabh
11. Accurate And Professional Underground Utility Mapping Services
Author: landsurveyor
12. What Does A Mortgage Broker Do?
Author: Andrew
13. The Revolution Of 3d Architecture Design: Transforming Visions Into Reality
Author: Askari Humbly
14. Expert Solutions For Ottawa Real Estate Management And Property Care
Author: William Gagnon
15. Indraneelam Infinia Sets A New Standard Of Luxury In Thrissur With State-of-the-art Safety And Security Features
Author: raseenadm