123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Education >> View Article

C-tplm30-67 E-books

Profile Picture
By Author: thomas lamar
Total Articles: 61
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

Question: 1

What are consequences of activating alternative labeling for functional locations?

A. You can assign a serial number to a functional location.
B. You can change the primary functional location label and keep the old label as a historical
functional location label.
C. The company code is automatically included in the functional location label.
D. You can change the primary functional location label and delete the old functional location label.

Answer: B

Question: 2

Which of the following control characters is available in the edit mask of the structure
indicator?

A. D (numeric characters)
B. M (alphanumeric characters)
C. Y (special characters)
D. A (alpha characters)

Answer: D

Question: 3

Which of the following information can the shift report display? (Choose three)

A. Planned and actual costs for shifts
B. Digital signatures for approval of a shift report
C. Maintenance plans and task lists
D. Maintenance orders and notifications
E. Measurement ...
... documents and goods movements

Answer: B,D,E

Question: 4

In Customizing, to what data must you assign digital signatures in addition to the order type?

A. Maintenance plant
B. Work center
C. Maintenance planner group
D. Planning plant

Answer: D

Question: 5

Your customer uses operating hours to execute a performance-based maintenance plan. Which
of the following data must you assign in the maintenance plan header?

A. A task list for performance-based maintenance
B. A cycle unit of measure with a corresponding characteristic from the measuring point
C. An order type for performance-based maintenance
D. A technical object with a measuring point

Answer: B

Question: 6

You have selected Confirmation Required in the control key for operations in a maintenance
order.
One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed?
There are 3 correct answers to this question.
Response:

A. TECO
B. PCNF
C. CRTD
D. CNF
E. CLSD

Answer: ABE

Question: 7

Where do you define initial and subsequent buffers for the maintenance plan strategy?

A. In the maintenance item
B. In the maintenance plan category settings
C. In the maintenance package for the maintenance strategy
D. In the maintenance plan scheduling parameters

Answer: C

Question: 8

Your customer wants to create a component for maintenance that does not allow physical
inventory.
Which material type must you use?

A. Spare parts (ERSA)
B. Maintenance assembly (IBAU)
C. Non-valuated materials (UNBW)
D. Operating supplies (HIBE)

Answer: B

Question: 9

You customize an order type to release orders immediately upon creation, and you assign the
order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?

A. Select a maintenance planner group and set the Do Not Release Immediately indicator.
B. Set the Do Not Release Immediately indicator in the task list header.
C. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
D. Select a maintenance activity type and set the Do Not Release Immediately indicator.

Answer: C

Question: 10

Your customer wants to settle costs of the refurbishment process to an inventory account.
What Customizing does the process require?
There are 2 correct answers to this question.
Response:

A. Special control keys for use in refurbishment operations
B. A specific order type for refurbishment processing
C. A specific settlement profile for the purpose of refurbishment
D. A specific notification type for refurbishment processing

Answer: BC

Question: 11

What do you use to set up a refurbishment order for external refurbishment?
Please choose the correct answer.
Response:

A. An external operation that contains a subcontracting indicator and a material item with a material
provision indicator activated.
B. An external operation that contains a control key for refurbishment.
C. An order type for external refurbishment and an assignment of a material with split valuation.
D. An order type for external refurbishment and a material item with item category External
Refurbishment.

Answer: A

Question: 12

What information does the value category provide in the maintenance order?
Please choose the correct answer.
Response:

A. The costs details for individual technical objects
B. The costs by work center
C. The material costs by valuation category
D. A summary of costs for multiple cost elements

Answer: D

Question: 13

What do you mean by the term PMIS.
Please choose the correct answer.
Response:

A. Project maintenance information system
B. Plant maintenance information system
C. Project management system
D. Process management system

Answer: B

Question: 14

What information does the value category provide in the maintenance order?

A. The costs details for individual technical objects
B. The costs by work center
C. The material costs by valuation category
D. A summary of costs for multiple cost elements

Answer: D

Question: 15

Factory calendars are assigned to the maintenance plant and work center.
By default, which factory calendar is used for work order scheduling?
Please choose the correct answer.
Response:

A. Planning plant
B. Main work center
C. Maintenance plant
D. Production work center linked to a technical object

Answer: B

Question: 16

How do you define operations for preventive maintenance tasks?
Please choose the correct answer.
Response:

A. By assigning the operations directly to the maintenance plan
B. By assigning the operations directly to the maintenance item
C. By assigning the task list to the maintenance plan
D. By assigning the task list to the maintenance item

Answer: D

More About the Author

yes, I am a Student and I am article author as well for CertsChief Network.

Total Views: 248Word Count: 860See All articles From Author

Add Comment

Education Articles

1. Advanced Diploma In Computer Applications: Full Form And Scope"
Author: Kanika

2. Trends In Mobile Marketing To Watch Out For In 2025
Author: Guru360 Training Academy

3. How To Prepare For A Driving Crash Course In Manchester
Author: Michael Ware

4. What’s Included In A Guaranteed Pass Driving Course In Manchester?
Author: Michael Ware

5. Azure Data Engineering Certification | Azure Data Engineer
Author: gollakalyan

6. Mern Stack Course In Hyderabad | Mern Stack Online Training
Author: Hari

7. Top 22 Sre (site Reliability Engineer) Interview Questions & Answers 2025
Author: Vedanti

8. The Power Of Internships: Unlocking Career Opportunities While In College
Author: Patuck Gala College

9. The Ultimate Guide To Terraform Automation Online Training
Author: SIVA

10. Prompt Engineering Course | Prompt Engineering Ai Courses Online
Author: Anika Sharma

11. Top Foreign Study Consultancy In Warangal – Your Gateway To Global Education
Author: Johnwick

12. Microsoft Fabric Training In Hyderabad | Visualpath
Author: visualpath

13. Best Ssc Coaching In Delhi: A Complete Guide To Success
Author: Bst Competitive Classes

14. Unlocking The Potential With Oracle Integration Cloud Training
Author: Rainbow Training Institute

15. Every Thing You Should Know About Ras Exam 2025
Author: DrGenius Academy

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: