Question: 1

Which of the following are prerequisites for business completion?(Choose two)

A. The order must have actual costs.
B. The order must be fully settled.
C. The balance of the order must be zero.
D. The order must have planned costs.

Answer: B,C

Question: 2

What information does the value category provide in the maintenance order?

A. The costs details for individual technical objects
B. The costs by work center
C. The material costs by valuation category
D. A summary of costs for multiple cost elements

Answer: D

Question: 3

Which of the following Customizing settings is required to assign a notification to a maintenance order operation?

A. Assignment of operations to all object list entries active
B. Assignment of order type to notification type
C. Maintain indicator for notification data on order header
D. Create default value profiles for general order data

Answer: A

Question: 4

When the user creates a maintenance ...
... plan for a call object (order), which value in the planning data determines the order type?

A. Priority
B. Maintenance activity type
C. Maintenance planner group
D. Main work center

Answer: C

Question: 5

A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must
they perform?

A. Create a new technical object to represent the new measuring point.
B. Create a special measuring document and set the Counter Replacement indicator.
C. Dismantle the old measuring point and create a new measuring point.
D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Answer: B

Question: 6

A user has planned an operation with labor costs and material costs; however, the material
cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?

A. In the overhead value category
B. In a new, automatically created value category
C. In the unassigned value category
D. In the internal activity value category

Answer: C

Question: 7

Which of the following always produces up-to-the-minute costing information for maintenance orders?

A. A standard analysis from the Plant Maintenance Information System (PMIS)
B. A standard query in SAP NetWeaver Business Warehouse
C. A maintenance order list
D. A shift report based on shift notes

Answer: C

Question: 8

Which task list can have both external and internal number assignment for the task list group number?

A. Bill of material task list
B. Equipment task list
C. General task list
D. Functional location task list

Answer: C

Question: 9

Which of the following is a function of deadline monitoring (transaction IP30)?

A. Generate a Logistics Information System (LIS) report for scheduled maintenance items within a specific period.
B. Convert maintenance notifications into maintenance orders within a specific period.
C. Convert maintenance calls into call objects within a specific period.
D. Generate a Logistics Information System (LIS) report for all overdue maintenance calls.

Answer: C

Question: 10

A maintenance plan has a completion requirement. The plan contains five maintenance
items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the
next maintenance call can be generated?


A. REL (Released)
B. ATCO (All Tasks Completed)
C. TECO (Technically Completed)
D. NOCO (Notification Completed)

Answer: D

More About the Author

yes, I am a Student and I am article author as well for CertsChief Network.

Total Views: 426Word Count: 611See All articles From Author

Add Comment

Education Articles

1. Mlops Online Course | Mlops Online Training
Author: visualpath

2. How To Transform Traditional Business Into Digital Business
Author: Sandeep Bhansali

3. The Importance Of Synonyms For Ielts
Author: lily bloom

4. The Importance Of Early Dyslexia Diagnosis And Intervention
Author: Bradly Franklin

5. 10 Ways To Support Students Who Struggle With Reading Comprehension Skills
Author: James Carter

6. Dsssb Coaching In Rohini – Your Pathway To Success
Author: Bharat Soft Tech

7. Become A Java Pro: The Ultimate Guide To Java Design Patterns
Author: login 360

8. 5 Reasons Why Jaipur’s Top Coaching Institutes Are Perfect For Ssc, Bank & Railways Preparation
Author: power minds

9. Mastering The Gre With Edunirvana - Your Pathway To Graduate Success
Author: sharvani

10. Which Is The Best Icse School For Primary Education In Bhopal?
Author: Adity Sharma

11. Paying For Assignment Help: A Guide To Making The Right Choice
Author: liam taylor

12. Golang Training In Hyderabad | Golang Online Training
Author: Hari

13. The Top No1 Terraform Training Institute In Hyderabad
Author: SIVA

14. Best Ai With Aws Training Online | Aws Ai Certification
Author: Madhavi

15. Generative Ai Training | Best Generative Ai Course In Hyderabad
Author: Renuka

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: