Production Planning & Scheduling Software - The Key To Increasing Production Throughput

Profile Picture
By Author: Groshan Fabiola
Total Articles: 2678
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

When it comes to optimizing their core production operations, companies in the manufacturing business must be able to gain control over idle and production cycle times. Although onerous and overwhelming without automation, this task becomes significantly easier to fulfill with the help of high-end production planning and scheduling software modules.

In order to increase production throughput by lowering cycle times, a company first needs to be able to identify, measure, and track these variables at all levels of its production line. This involves undergoing a thorough process of production tracking, followed by accurate measurements and calculations aimed at eliminating lost time, reducing operating costs and increasing production. State-of-the-art production scheduling and planning software can help a lot in all of these areas, and with minimum financial expense and effort.

Understanding Production Cycle Times

In the field of manufacturing, there is a cycle time for the finished product, and one for each separate operation in the production line. In essence, cycle times are nothing more than the ...
... amounts of time it takes to complete particular work tasks. Despite being an easy concept to understand, many companies tend to overlook cycle time issues because examining each production stage for cycle time-related deficiencies can entail many drawbacks. However, with the right production planning and scheduling software solution, the task of optimizing cycle times can be concentrated in just four simple steps:

1. Logging Initial Cycle Times

Before a company can begin calculating cycle times, it first needs to capture their original values as accurately as possible. Logging these initial times and identifying their flaws sets the stage for future cost reductions by eliminating the causes of downtime.

2. Making the Correct Adjustments

Once all relevant cycle time values have been gathered, with the aid of dedicated software it is easy to pinpoint the main sources of lost times and eliminate them from the picture. In most situations, lost times are the result of using old, faulty machinery or of issuing unclear production instructions/confusing work orders. Yet, the list with potential reasons for high cycle times is much broader than that. In order to be able to identify any probable cause, you will need to make sure that all the initial data you collect is accurate.

3. Taking a New Set of Cycle Time Values
Next, it is necessary to take a new set of times in production while excluding the sources of downtime identified during the initial trial. Although at this step you may still spot some discrepancies and fluctuating data, the flaws that emerge here should be less significant than before. If during this second measurement you still get unusually high lost times, repeat the process from the very beginning and pay attention for any missed sources of downtime.

4. Comparing Values and Determining the Median Cycle Time

The final step in production tracking involves comparing previously logged values and determining the median cycle time, which will indicate the ideal time needed for each manufacturing operation in your production line.

With the help of dedicated production planning and scheduling software, as well as other similar automated modules, companies can optimize operations and increase their production throughput substantially. However, note that the evaluation described here is not a one-time event. To avoid other potential delays in production and maintain a smooth, optimum chain of operations in your manufacturing process, you will need to undergo these steps on a regular basis and redress any eventual issues before they escalate.


For more resources about production tracking or about production planning software or even about production scheduling software, please review these links.

Total Views: 223Word Count: 610See All articles From Author

Add Comment

Hardware/Software Articles

1. Web Application Vs. Desktop Application: Which Is Right For Your Business?
Author: Aqlix IT Solutions Pvt Ltd

2. 11 Smart Gadgets For A Safer, Productive, And Relaxed Solo Life
Author: GoDigitalLock

3. The On Time On Budget Website
Author: Sataware

4. Reasons Why Your Coworking Space Need A Digital Upgrade?
Author: RentAAA

5. What Is An Invoice Management System Under The Gst
Author: Aakash Parikh

6. Importance Of E-invoicing In Malaysia
Author: Aakash Parikh

7. Design Feedback Tool Development In 2025: Emergencies, Technology, And Collaborative Design's Future
Author: ayush

8. Best Microfinance Software Development In Lucknow
Author: SigmaIT Software Designers Pvt. Ltd.

9. Best Software Company In Lucknow: Sigmait Software Designers Pvt. Ltd
Author: SigmaIT Software Designers Pvt. Ltd.

10. Challenges In Advertising In The Digital World
Author: ayush

11. Cabcher: Revolutionizing Taxi Dispatch With Advanced Technology
Author: isebella

12. Why Progressive Web App Development Is The Future Of Digital Experiences
Author: Elite_m_commerce

13. Creative Review Software's Function In Simplifying The Design Process
Author: ayush

14. Root Intrusion: Identifying And Preventing Damage To Your Sewer Pipes
Author: Nu Flow Technologies

15. How Cipp Sewer Repair Revolutionises Traditional Pipe Replacement
Author: Nu Flow Technologies

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: