How to install the perfect steam shower

You have saved your hard earn cash for ages, your bathrooms probably in disarray and you have be left to face the seemingly mammoth task of installing your new steam shower enclosure from scratch. Although just like anything else, installing a steam shower is always easier when you have done several before. Installing a steam shower correctly as complex as you might first think.
There is some guideline which you should follow whilst doing the installation which if you put in place whilst you are doing the installation will ensure the perfect installation every time.
So you hve got your spanner in hand, the instructions that came with the unit are probably 3 half pages of broken English or Chinese useless garbage and you dyeing to finally take a shower in your luxury unit. In this article we will try and address some of the essential element required to complete the perfect steam shower installation.

What Should Be In Place Before We Start:

WATER FEEDS:

Firstly the hot and cold water connections, all steam cabins will work of a 15mm connection. Somewhere ...
... behind the unit you will need a water supply for both your hot and cold ready to be adjusted to connect onto your steam unit. The connection on the back of the steam cabins valve will always be a 15mm male connection. The best way to make the connection between the unit and the supply is via braided flexible hoses. Because of the way a steam shower is built away from its final resting position to allow the build of it, the braided hoses allow the flexibility required to move the unit back and forth. Connection via the hoses should be made to the 15mm threaded connection on the valve and some isolating valves fitted on the piping feeding the water supply to enable you to shut of the water to the shower if needed in future (good practice) and this also enables you to turn the water back on the house whist you carry on with the installation. The best units will come with these flexible hoses supplied.

WASTE PIPE:

To fully enable your unit to fit fully against the wall or corner desired, without the need to cut or otherwise modify the unit, the wastepipe to the unit will need to be supplied under the floor. A 1 1/2 inch wastepipe with adequate downwards fall should be located somewhere beneath the steam shower. Again because of the need the move the unit around whilst the build is taking place, the connection to the showers trap must be made by a flexible waste connector. The best units will come supplied with these, if not, they are available to buy from any good hardware store.

ELECTRICS:

Most common steam shower cabins electric feed will be made by a 13 amp standard 240v connection (two if it has a whirlpool bath function). This is the single most important bit and with all electric works, especially when water is involved MUST be carried out by a qualified trades person. The Steam units require a 13 amp isolated fused spur to be fitted to ensure full water proofed connection. The sockets must be on a RCD to ensure safety and to isolate the unit if required. Your electrician will advise you on this, as I said a qualified tradesman must do the electrical fitting. The power within the unit is converted to operate the lighting and radio is converted to a safe 12 volts.

Building The Unit:

RULES YOU MUST NEVER FORGET!

1. PTFE, which stands for Poly Tetra Fluoro Ethylene or as a plumber calls it Plumbers Tape For Everything. Should be used on every 15mm connection.
2. Dont screw up and screws tight until the end. This allow the panels and glass to move and twist into position as you go.
3. Check every component before you start
4. Do you need a PEV? Pressure Equalising Valve? Thisonly protects the life and functionality of any shower valve but also helps ensure constant temperatures. READ MORE HERE
5. If its possible to fill the tub or tray with water before you start to check of cracks of leaks, do so.
6. After the installation is complete, leave the unit 24 hours to let the any silicone to fully set before use

BASE/TUB:

Ones everything is in place and you are ready to go, spanner in hand, the first obstacle you will face is the tray or tub base to the shower itself. First port of call is to fully connect and ensure the watertight connection of the trays trap and waster pipe. Ensure all rubber gaskets and fittings are tight and well fitted, it might be an idea to our some water into the trap or fill the tub to ensure theres no drips at this stage as its easier to access. Second, is to fully level the tray or tub via the adjustable legs. Check, check and check again, having the tub fully level is essential to the rest of the build to not only ensure its stands straight and upright, but also to ensures all connections are made whilst the individual components are without any gaps and are sitting as they should be.

WALL AND CONTROLL PANEL:

This is when you will need two people. First look over every panel and the back of the control panel and tighten up and connections to the valve, water jets and anything that you can see, as many are only hand tight for transport purposes and will not initially be water tight. First thing you will need to do is place the back panels onto the tub and all but tighten up there connections to the base, dont tighten these fully yet, leave them with the fixings to hold them in place but slack enough to allow them have some maneuverability. Then place in the control panel, the best steam shower units will have either a rubber or plastic strip running along the lengths of where the panels meet to ensure a waterproof fitting, LIKE THESE. Otherwise it would be more than wise to run a small bead of silicon down the lengths, its better to use too much silicon than too little as any excess can simply be wiped off.

DOOR FRAME AND GLASS:

With your shower now looking something like a shower. The next thing to tackle is the framework for the glass doors. The best way of doing this is to build this up separate from the shower itself and lift it into position on its completion. The connection screws for the framework is notoriously tricky to put together so first ensure you have enough space around you to fully manipulate and move the framework around. Starting at the bottom up, first attach the two sides to the base piece, and then the top framework. Then install any fixed glasses and support/holding pieces into the framework. Once this is done, lift the framework onto the shower tray or tub, again using silicone if necessary tighten up the connection between the framework and panels. REMEMEBER nothing should yet be screwed up tight to allow all pieces to fully fall into place throughout fitting.

ROOF:

The Roof is usual the home to all the main functions and features that come with a steam shower. Carefully lifting the roof onto the shower, ensure all holes marry up as they should. (it not as important to silicone between the roof and panels that it sites on, as this should be at a level where volumes of water shouldnt be getting to)

CONNECTIONS:

Now its probably the best time to fix any shelves, riser rails and any other components that come with the shower to the unit itself and to fully tighten up all the screws and fixings on the shower that have been left, check before doing this that every panel and piece fully stand and fit as they should. Also its a good time now to connect the electrics to the supply and connect all the connections to the fan, speakers or any other connections that need to be in place. Its also possible now to connect the hot and cold water via the braided hoses. All connection should be straight forward and labeled to match each other. The steam generator will most communally have three connections to it 1st the water supply, which is most communally located in the middle and feeds from the shower valve or directly from the cold water feed. 2nd the steam outlet, which is positioned the highest of the three and feeds to the steam outlet on the unit and finally the 3rd which is the water drainage, this will in most cases fit to the waste via a pipe thats attached to it on a spigot.

DOORS:

Hopefully if I havent missed anything out the last thing you should be left with is the doors to the unit. Before you fit theses its a good idea, as with any shower enclosure, to run a small bead of silicone along the lengths of the panels and tray/tub to ensure a waterproof fitting. This is not always necessary but does greatly add the water integrity of the unit, Then depending on the quality of the unit spend a couple of minutes looking for any gaps of weak points on the frame work where any water may penetrate. Finally the doors, using the door cams provided simply fit these to the frameworks runners adjusting them to fit and slid straight via the adjustable cams .

THE FINAL CHECK:

First run though all the functions both electric and water, checking on top, behind and below for any leaks, drips or any sign of anything out of place, BE THOUROGH!! After this is all ok which it will be if you have followed this guide, its time for the final check, put the valve onto the shower head and spray away! Methodically spray the corners then up and down the connected lengths, move to the next, along the bottoms and in turn spray everywhere, with one person spraying and another behind the unit to check for complete water integrity before sliding the shower happily back into its final resting place.

Thats it, you are done. Relax.
Hopefully along with this guide and a little thinking from yourself your shower is now perfectly installed and ready to use. A steam shower is a fantastic luxury item that is absolutely fantastic place to relax and unwind, and when installed correctly is a lifelong, endurable feature for your bathroom.
About Author:
Steam shower installation

For good honest advise and more article like this
please visit us at
Steam shower installation

Total Views: 246Word Count: 1761See All articles From Author

Add Comment

Health Articles

1. 5 Signs You May Need Dentures And How To Begin Treatment In Miami
Author: Travis Anderson

2. Kids Dental Clinic In Noida: Why Nayar Dental Is The Best Choice For Your Child’s Oral Health
Author: Nayar Dental

3. How To Choose The Best Thc Vape Pen For Your Needs
Author: Brad Hogg

4. Expert Skin Checks And Minor Surgeries At Main Street Medical Centre
Author: Main Street Medical Centre

5. High Impact Vs. Low Impact Exercise
Author: healingherbs

6. What To Expect During An Ivf Cycle: A Step-by-step Guide
Author: Surrogacy Centre India

7. Organic Turmeric Powder: Golden Goodness For Health And Wellness
Author: GreenJeeva Puspa

8. Fast And Reliable Bed Bug Removal Services In Gold Coast
Author: The Pest And Termite Co

9. Top Cannabis Products To Try From Toking Teepee
Author: Brad Hogg

10. A Comprehensive Guide On Best Oncologist In Mumbai For Breast Cancer
Author: Anil Cancer Clinic

11. 8 Foods To Eat During Breast Cancer Treatment
Author: Galaxycare

12. Transform Your Smile With Teeth Aligners: Easy Dentist Appointments In Paschim Vihar
Author: Essence Dental

13. What Does Simparica Treat In Dogs?
Author: Vetsupply

14. Salugenesis In Mitochondria: Enhancing Cellular Health And Energy Production
Author: sonya

15. What To Know About Lasik Eye Surgery In Vista: A Guide To Clear Vision
Author: Morris Eye Group

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: