Top 8 Cataloged Recommendations To Manage Your Rfis Effectively
Keeping business efficiencies at maximum and handing over construction projects within budget and timelines is crucial for General contractors. Connecting the mindscape of architects and engineers with general contractors to understand the intent, and build around it is key whilst collecting project information. Wellstructured RFIs or Request For Information eliminates the need to perform expensive and time-consuming corrective activities in the construction stage. RFIs are raised in the bidding phase, or at various stages of construction.
General contractors or subcontractors raising RFIs in the construction stage are extremely expensive leading to cost and time overruns. Neglecting design clarifications, constructability issues, material requirements, sequencing, specifications, etc. can lead to extensive onsite failures.
“Generally, contractors have to take responsibility for the burden of delayed responses of RFIs submitted.
Slide 2
RFIs serve as a support system to diminish all of the above, as they can be
integrated into various deliverable categories viz.
• Clarifications ...
... on inaccurate plans, spatial conflicts, inaccurate or incomplete specifications
• Design modifications based on construction problems and sequencing issues
• Material availability, value engineering, and others
• Issues in constructability and varying site conditions
Slide 3
Furthermore, the unintended use of RFIs can lead to greater costs. It has been documented, “ a single RFI can cost over $1000”. If there were hundreds of RFIs raised in the later stages, it would amount to hundreds of thousands of dollars in cost overshoots. RFIs are not intended for the following purposes viz. ordinary communication, submittals, granting design documents, substitutes, change requests, feedback, etc. RFIs do become high-risk documents if not created and managed effectively. Misuse of RFIs in the later stages can create greater challenges than solutions for contractors and subcontractors.
Slide 4
Described below are well-documented recommendations for contractors and
subcontractors to produce effective and productive RFIs. Working on numerous projects requires project managers and contractors to collaborate and diminish high-impact construction risks.
1. Encourage discussions between various trades and teams in the
preconstruction stage.
Early involvement of multiple teams, trades, and stakeholders in the design stage fuels greater communication and collaboration. Clarifying doubts before the actual construction process begins can diminish budget and schedule overruns.
2. Deploy an integrated and cloud-based construction management
software.
Raising, assigning, and clarifying RFIs requires advanced construction
management software like iFieldSmart Technologies. Backoffice and onsite
personnel can collaborate on issues, raise questions, and produce solutions to streamline the RFI processes. Tracking hundreds of individual RFIs can be time-consuming and cost-incurring. Cloud-based software instantly allows every stakeholder to interact and manage RFIs for higher productivity.
3. Be specific with asking the right set of questions.
Creating different RFIs for individual questions makes the RFI creation and assigning process streamlined. Greater numbers of unnecessary RFIs can create a higher cost impact. Advanced construction management software can analyze the impact of cost for specific RFIs. Consolidating questions and their issues can lead to greater complications in tracking RFIs.
Contact Us: - 703-994-4242
Visit us: - https://www.bimengus.com
BIM Engineering US is a leading Building Information Technology solution service provider offering end to end solutions in Mechanical, Electrical, Plumbing and Fire Protection systems engineering, design and construction.
Add Comment
Technology, Gadget and Science Articles
1. What Are The Top Features That Make Casino Games Engaging For Players?Author: josephprince
2. Understanding The Impact Of Dubai’s Real Estate Regulations On Property Management Software
Author: Dynamic Netsoft
3. Digital Media
Author: Tahir Lateef
4. How To Get Started With Quantum App Development: A Step-by-step Guide
Author: adrianevans
5. How To Develop On Demand Laundry App Like Washmen
Author: Deorwine Infotech
6. Innovative Series E Valve Technology Combines Sustainability With High Performance
Author: Pfeiffer Vacuum+Fab Solutions
7. Elevate Your Content Management With Wave
Author: 5Flow
8. How Automotive Supply Chain Software Enhances Operational Efficiency And Reduces Costs
Author: QSS Technosoft
9. How To Choose The Right Pcb Conformal Coating For Your Project
Author: David Ly
10. Technological Gadgets
Author: Tahir Lateef
11. Technology
Author: Tahir Lateef
12. Ultimate Guide To Circuit Card Assembly And Pcb Board Assembly
Author: circuitcardassembly
13. Building High Performance Websites With Progressive Web App Development
Author: Elite_m_commerce
14. Maximising Productivity With Odoo Erp: Drive Business Growth With A Customisable Solution
Author: Alex Forsyth
15. Digital Transformation In Construction: Shaping The Future
Author: QSS Technosoft