123ArticleOnline Logo
Welcome to 123ArticleOnline.com!
ALL >> Technology,-Gadget-and-Science >> View Article

Leverage Faster Project Delivery, Minimize Cost, Enhance Productivity, And Project Quality With 5dc Bim

Profile Picture
By Author: bime
Total Articles: 111
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

5D Estimation helps project stakeholders understand the project better, and collaborate efficiently. This preconstruction estimation data is used by designers, engineers, and other project team members to make informed decisions in terms of project planning, cost management, purchase, quality, etc.
The benefits of 5D BIM cost estimation have been highly recognized in the AEC industry. It is undoubtedly helping project owners and stakeholders leverage faster project delivery, minimize cost, enhance productivity, and project quality.
The integration of design and cost estimation in preconstruction provides deeper analysis and project insight. The effective use and transference of data across the various project lifecycle creates a robust platform to avoid project rework, data loss, etc.
It also helps project stakeholders build better bidding proposals, efficiently handle project execution, and ensure positive project delivery.
Robust estimating software can augment the complete process through data transparency, mitigate errors & risks, etc. All this and more to ensure owners and project stakeholders ...
... can leverage better ROI.
Advantages of a fully connected BIM workflow based on 5D cost estimation
 Helps estimators work more efficiently
 Leverage unprecedented levels of information to enhance collaboration
 Enhance overall project performance through design & construction linking
 Better project visualization based on accurate estimation
 Augment quantification of modeled materials
 Find optimal accuracy and solution in calculating costs and planning
 The highly visual process makes it easier for estimators to understand new processes and technology
 Generate greater cost estimates at quick rates
 Create & deliver precise data for planning and field implementation
Along these lines, accurate estimation through high-end software helps create seamless workflows across all the project lifecycles.
How does 5D Cost Estimation Help?
 Build automated estimations based on access from 3D models – accuracy eliminates errors and rework
 Increase in overall accuracy based on automated data processing
 Leverage historical cost data based on accurate takeoffs
 Connect data across various systems for project planning, cost management, etc.
 Cost management tools can be used to verify 5D estimation data based on comparisons between budgeted data and the actual amount
 Gain greater insight into the project through accurate 5D cost estimation
 On-site personnel can leverage building strategies and gain insights through real-time information on materials, costs, etc.
Understanding Design and Construction as an Integrated System
 It is important to identify a very strong relationship between design & construction, it can be best viewed as an integrated system
 That said, the design creates a highly detailed description of a building, facility, infrastructure, etc based on models, plans, etc.
 Whereas, construction planning involves the identification of activities and resources to make these projects a reality
Various characteristics need to be considered based on design and construction
 Every building, infrastructure, or facility is unique and requires custom designing
 Every project takes a specific time to complete
 Design & construction for a specific project need to satisfy certain conditions
 The service life or sustainability of a building, infrastructure, or facility is long
 Project complexities can cause changes in designs during the construction phase
The integration of 5D cost-estimation at the design and construction phase creates a robust design and construction workflow and mitigates most of the challenges based on rework, budget and time overruns, etc.
The Cost –Estimation workflow
 Prepare a plan to begin the estimation
 Create an estimate
 Manage your estimates
 Enhance the estimation technique
Prepare a plan to begin the estimation –
 The primary objective of the project team would be setting a definition through a broad vision
 Identify resources to begin the estimation
 Identify any kind of constraint
 Build a project charter or initiation document
 Identify people for budget management & approval
Prepare an estimate –
 Use various cost estimation techniques to create and maintain a budget
 Leverage policies, market conditions, templates, etc., to build an estimate
 Build estimates based on parametric and analogous estimation
 Use WBS or Work Breakdown Structure using the scope and duration
 Cost baselines are the approved time-phased budget and will be leveraged by the project manager to manage the complete estimation process
Manage your estimate –
 The Project Manager is responsible to oversee various phases of the cost estimation process
 Specific cost estimates can be factored in the project execution phase based on specific costs from vendors, required resources, etc.
 This helps project managers convey transparent information and manage better stakeholder communication
Enhance the estimation technique
 The project manager is responsible for managing and improving project cost estimates based on specific KPI’s
 These KPI’s can be listed as project objectives, effort, cost analysis or tracking, and project performance
 Project Managers can use EVM to perform Earned Value Analysis that can compare the earned value, planned value, and actual costs
 Change requests can be managed and the necessary project documents need to be updated based on the change requests
Various Cost Estimation Techniques
5D Cost Estimation can be achieved through various techniques viz.
Analogous Estimation – use historical data to determine project costs in the early stages of the project
Statistical Estimation – determine estimation based on parametric calculations
Bottom-Up Estimation – determine estimation based on individual work or tasks
Three-Point Estimation – determine estimation based on 3 techniques viz. optimistic, most likely, and pessimistic
Cost of Quality – determine estimation based on expenses during the project to prevent failures and expenses done after the project to focus on failures
Reserve Analysis– determine estimation based on reserves that need to be kept aside or allocated
Conclusion
Using 5D cost estimation across the entire project lifecycle, estimators or estimation companies can save on valuable time and cost. The BIM 5D estimation advantage lets stakeholders view the model along with the necessary schedules. This ensures all the teams get a clear grasp of how changes can affect the cost cycle and vice-versa based on invaluable information. BIM estimation from design to construction always works towards owner and stakeholder advantage.
Contact Us: - 703-994-4242
Visit us: - https://www.bimengus.com

More About the Author

BIM Engineering US is a leading Building Information Technology solution service provider offering end to end solutions in Mechanical, Electrical, Plumbing and Fire Protection systems engineering, design and construction.

Total Views: 280Word Count: 919See All articles From Author

Add Comment

Technology, Gadget and Science Articles

1. What Are The Top Features That Make Casino Games Engaging For Players?
Author: josephprince

2. Understanding The Impact Of Dubai’s Real Estate Regulations On Property Management Software
Author: Dynamic Netsoft

3. Digital Media
Author: Tahir Lateef

4. How To Get Started With Quantum App Development: A Step-by-step Guide
Author: adrianevans

5. How To Develop On Demand Laundry App Like Washmen
Author: Deorwine Infotech

6. Innovative Series E Valve Technology Combines Sustainability With High Performance
Author: Pfeiffer Vacuum+Fab Solutions

7. Elevate Your Content Management With Wave
Author: 5Flow

8. How Automotive Supply Chain Software Enhances Operational Efficiency And Reduces Costs
Author: QSS Technosoft

9. How To Choose The Right Pcb Conformal Coating For Your Project
Author: David Ly

10. Technological Gadgets
Author: Tahir Lateef

11. Technology
Author: Tahir Lateef

12. Ultimate Guide To Circuit Card Assembly And Pcb Board Assembly
Author: circuitcardassembly

13. Building High Performance Websites With Progressive Web App Development
Author: Elite_m_commerce

14. Maximising Productivity With Odoo Erp: Drive Business Growth With A Customisable Solution
Author: Alex Forsyth

15. Digital Transformation In Construction: Shaping The Future
Author: QSS Technosoft

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: