Effective & Efficient Onsite Verification Is Critical For Your Aec Projects

Profile Picture
By Author: BIMe
Total Articles: 111
Comment this article
Facebook ShareTwitter ShareGoogle+ ShareTwitter Share

Challenges that projects and stakeholders face during onsite verification
 Last-minute onsite clashes between various building members leading to rework and cost overruns
 Inadequate project visualization inducing poor coordination and collaboration
 Inaccurate or incomplete construction drawings leading to installation failures
 Project delays arising due to changes in onsite requirements and scope
 Lack of project automation and management leading to deliverables that do not conform with client requirements
 Low-grade fabrication based on inaccurate or incomplete shop drawings
 Unreliable material procurement leading to onsite waste
Services offered for onsite verification
 Risk Management
 Quality Assurance
 Communication and collaboration
 Project scheduling & cost estimation
 On-site observation
 Contractor payments
 Third-party model auditing

Benefits of using services and tools for proactive onsite verification
 Verify project certifications
 Confirmation ...
... of onsite accuracy
 Meeting client dimensions and requirements
 Detailed visualization to actual project tolerances
 High-resolution 360 photo capture and documentation
 Accurate construction drawings
 Early clash detection
 Prefabrication and fabrication
 Comprehensive construction automation and construction management using tools and software
The importance of construction verification in various phases
Design Phase
 Reduce risks by generating confidence in As-Built data
 Mitigate rework, scope creep, and contractual variations due to inaccurate data projections
Construction Phase
 Achieve client verification needs before hand-over, often mentioned in the scope of services
 Better sub-contractor deliverables before a sign-off
 Improved confidence levels for designers through existing onsite work
 Quick resolution of existing project variances
Maintenance Phase
 Accurate & robust As-Built information for better decision-making on operational expenses(OPex) and refurbishment
Viable onsite verifications processes in the construction phase.
 Quick approval of BIM models for greater accuracy and sustainability
 Evaluation of LOD for project model’s vs certain specifics helps build client-specific BIM models
 Detailed project reports of the model based on enhancements and standards enable better constructability, design intent, design validation, etc.
BIM model auditing using 3rd party consultants reduces rework and cost overruns.
1. Document reviews
2. Model integrity & accuracy verification against design intent
3. Design confirmation & validation
4. LOD reviews against scope, objectives, and design function
5. Evaluate model conformity with 2D Design
6. Model-checking audits
7. Clash audits
8. Schedule audits

Precise and detailed BIM modeling reduces onsite risks through quick error detection.
1. High-quality MEP modeling at LOD 500 through value engineering and coordination
2. Accurate model-based fabrication based on LOD 400
3. Proactive onsite support with quick error and clash detection
4. Model-based construction & shop drawings for hangers, electrical, plumbing, and sheet metal
5. Detailed design reviews for clash detection
6. Building highly-detailed BIM objects
Accurate and detailed As-Built Modeling reduces installation failures.
1. High-quality As-Built 2D and 3D models for existing projects and layouts
2. Specialized As-Built modeling for material equipment, overhead structures, HVAC piping, conduits, instrumentation, etc.
3. Easy model management based on a centralized repository
4. Detailed CAD cleanups for MEP firms
5. Accurate MEP As-Built models from 2D drawings
Onsite BIM support mitigates changes in onsite requirements and scope.
1. Skilled on-site support to derive exceptional insights for communication and collaboration
2. Maximize efficiency and deliver project outcomes
3. Specialized trade coordination for on-time project delivery
4. Coordination meetings to mitigate clashes in the early project lifecycle
5. Save on time and budget to increase profitability
6. Analyze gaps in team coordination and collaboration
7. Adopt accurate process workflows and practices
8. Proactive clash detection for greater onsite efficiency
Accurate Procurement and QTO reduces onsite material waste.
1. Solid takeoff to build accurate cost estimates and construction budgets
2. Better onsite verification with strong QTO’s for detailed drawings and reports
3. Accurate onsite data acquisition using powerful automation and construction management tools
4. Accurate construction documentation and library creation to build precise Quantity Takeoff’s
Precise 4D Schedules enable timely handovers through accurate timelines.
1. Building accurate 4D Schedules to verify each material, resource, or equipment is set in place
2. Better scheduling insights drive better onsite verification of project deliverables
3. High-quality 4D scheduling videos to allocate optimum project resources
4. Generate and analyze clash reports to verify onsite installation and activities
Precise 5D Cost Estimates help build accurate and detailed cost visualization.
1. Leverage precision onsite cost verification with accurate cost estimates
2. Top-of-the-line model authoring software to create accurate 3D models and build precise cost estimates across the entire lifecycle
3. Agile projections to make informed decisions and deliver positive project outcomes
Proactive onsite verification helps fabricate building components better.
1. Onsite installations become seamless with accurate shop drawings for pre-fabrication
2. Accurate and detailed fabrication drawings across various trades help draw better ROI, time savings, and profitability
3. Spool drawings for pre-fabrication
Streamline post-construction operations with proactive Facilities Management.
1. Verify onsite data accurately helps facilities managers and owners streamline Facilities Management
2. Data analysis
3. Condition Assessment
4. Digitize Existing Data
5. Leverage data interlinking
6. Gather new data through Laser Scanning and Point Clouds
7. EAM – CMMS Data Integration
Verify onsite data through Point Clouds.
1. Conduct accurate and high-density laser scans to document the existing structure
2. Highly accurate and quick scanning produces precision scans through millions of Point Clouds
3. High quality scans with an accuracy of +-1 mm
4. Point Cloud conversion to Scan-to-BIM models helps augment the renovation, retrofitting, and expansion process
Construction Management Software.
iFieldSmart fits right into your project needs to mitigate risks.
Influence better design, construction, and management workflows.
 Reduce data fragmentation, storing federated models, drawings, RFI’s, Submittals, Schedules, etc. for various projects in one place helps access the most updated information
 An intuitive dashboard helps project stakeholders leverage accurate and effective analytics on open, closed, and resolved clashes and viewpoints
 Stakeholders can leverage quick clash sync with over 50 clashes/min at 99% availability through detailed clash management, quick clash assignments, and more
 The Clash View Point Manager helps organize, extend, and augment the clash-test process
 Modelers, designers, engineers, etc. can help assign clashes to trades, rename clashes, rename viewpoints, merge, etc.
 Effective management of project RFI’s helps stakeholders get a clear picture of project-wise RFI’s through various parameters viz. drawings, cost impact, initiation date, status, etc.
 Architects, designers, engineers, contractors, etc. can leverage efficient submittal management for each project based on their ID, specification sections, number & revisions, submittal type, due date, etc.
 An inaccurate timeline can cause serious project delays, rework, onsite issues, and more
 Using accurate schedule figures for various tasks helps identify start date, planned date, task type, progress, labor cost, etc.
 Manpower savings of about 75% can be achieved in the preparation of building plans
Derive powerful insights from customized reports.
 Comprehensive & customized reports on Issue Management, RFI’s, and Submittals make design seamless across various trades and building levels
 Project designers and teams can leverage an accurate count on overall, tradewise, and levelwise issues, and use effective analytics to resolve to design various issues
 Mitigate high costs of administration and review of RFI’s with accurate analytics based on closed or overdue RFI’s
 Architects and engineers can leverage an accurate submittal count of shop drawings, project data, etc. to enable better design, fabrication, and installation
Access and visualize your design deliverables better with Forge.
 Using the power of Forge, 3D BIM models can be viewed on a web-browser
 Automating the BIM process helps connect design teams, workflows, or visualize project data
 Powerful Forge integration with iFBIM helps view and control assemblies, section cuts, and perform model measurements in a browser setup
 Leverage the power of connected design with Forge through BIM 360, data management, reality capture, and 3D viewer
Make model comparisons quick, effective, and efficient.
 The ability to compare various model versions helps resolve ambiguities and create models as planned
 iFieldModelCompare collects required model data and compares their differences
Build a complete design and construction snapshot with proactive Facilities Management.
 Get a detailed snapshot of your building components through various levels and room numbers
 Filter results to quickly display the required view name, room name, element name, etc.
 Facilities managers, contractors, and owners can draw detailed information about building components for better decision making
Do more for design collaboration with efficient and productive virtual meetings.
 Enhanced coordination and collaboration within various stakeholders helps fuel quick decision making, and significant savings in rework
 As an AEC firm struggling at coordination and collaboration, iFMeets is the answer to leverage the power of virtual meetings
 Construction virtual meetings cut down on unnecessary meetings, rework, build better project clarity, and enable visual project interaction
 With the ability to record meetings, share screens, upload construction documents for simultaneous annotation, and more, project stakeholders can collaborate seamlessly
 This saves a considerable amount of time, money, and resources by connecting offsite and onsite personnel
Leverage project document storage, access, and sharing in the cloud.
 The ability to store, access, and share building data from a single point of truth or a Common Data Environment (CDE) helps accelerate every design, construction, and maintenance process
 Cloud storage capabilities for construction data helps stakeholders access data from anywhere, and anytime
 Hold a quick meeting on a certain document, or share QR codes to various stakeholders with in-depth information on building components
 Storage, access, and sharing challenges of building documentation can be resolved by creating a single point of truth for various files viz. .JPEG,. NWF,. RVT, .PDF, etc.
iFieldSmart Technologies – a high-performance AEC software suite.
 iFieldSmart Technologies holds solutions to every AEC design, construction, and maintenance challenge under one roof
 As a suite of connected AEC software, iFieldSmart Technologies can resolve design risks, financial risks, operational risks, and labor risks
 Comprehensive software automation helps speed up the design process at very high accuracy, which creates a positive impact on other project phases
 With project costs in mind, iFieldSmart software is fairly priced to leverage better productivity, efficiency, positive outcomes, and high ROI
Conclusion
 Turning to proactive onsite verification allows end-users like material suppliers, general contractors, and other stakeholders to review onsite work remotely
 Modern construction technology integrated with BIM helps augment the entire onsite verification process for various project types
 Effective and efficient onsite verification will continue to be a crucial part of the overall construction process to overcome various challenges and turn them into game-changing opportunities
 Construction verification through third-party services helps set an additional set of eyes to achieve accuracy, and work is consistent with specifications and plans

Contact Us: - 703-994-4242
Visit us: - https://www.bimengus.com

More About the Author

BIM Engineering US is a leading Building Information Technology solution service provider offering end to end solutions in Mechanical, Electrical, Plumbing and Fire Protection systems engineering, design and construction.

Total Views: 240Word Count: 1552See All articles From Author

Add Comment

General Articles

1. Best Vlsi Projects For Ece Students
Author: Sandhya

2. Top 5 Reasons To Choose The Best Joint Replacement Surgeon In Jaipur For Your Surgery
Author: uttam

3. Electrical Efficiency How High Quality Filament Insulating Tape Can Transform Your Power Transformer Maintenance
Author: jarod

4. Crafting Elegance With Luxury Hotel Uniforms
Author: catherin

5. كيف تختار افضل شركات العقارات في عجمان؟
Author: tarek

6. Ways To Improve Your Language Vocabulary
Author: Lavy Johnson

7. Mastering Mobile Development: Why React Native Training Is A Game-changer
Author: Infograins tcs

8. The Art Of English To French Translation For Global Brands
Author: CCJK Technologies

9. Maximise Your Refunds With Expert Tax Accountants!
Author: Zib Digital

10. Dielectric Insulation Properties Of Ptfe Film Tape Key To Safe Electrical Applications
Author: susie

11. The Power Of Brand Activation Services: Elevate Your Business Impact
Author: Good + Bar

12. The Rise Of Ai In Digital Marketing: How To Leverage Technology For Success
Author: Praveen prajapati

13. Why Choose Hampton Style Home Builders For Your Dream Home?
Author: longislandhomes

14. Creating Lasting Memories With Luxury Yachts In Dubai
Author: The Yacht Brothers

15. Third Party Pharma Manufacturing: Streamlining Production For Pharma Companies
Author: mypharma

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: