1.Harvard Business School/Taj Lands’ End

DESCRIPTION OF THE PROBLEM:

Harvard Business School (HBS) has recently launched a new amphitheater-style classroom, built and owned by the Taj Lands End, owned by the Indian Hotels Limited. This new space replicates the classrooms on the School's Boston campus, giving participants and students a true Harvard Business School case method learning experience, for the first time in India.
The Harvard Business School Campus at Taj Lands End was inaugurated by Mr. Ratan Tata himself in early March 2012.
The new HBS campus, with a seating capacity of up to 82 students, will offer state-of-the-art multi-media facilities that augment the educational experience of the students. The room, a first of its kind in India, is virtually indistinguishable from the MBA classrooms in Boston in terms of aesthetics as well as technology, IT infrastructure, telecommunication equipment, and connectivity to Harvard Business School’s campuses all over the world. Altogether, the IT infrastructure and communications equipment are worth a cool 50 million US dollars. An obvious requirement ...
... was a state of the art fool proof waterproofing system that would guarantee continuous connectivity to HBS’s campuses worldwide and ensure zero downtime.

The site chosen was underneath an exposed terrace about 14 years old. The project was undertaken in the monsoon of 2011 and the entire slab was leaking in multiple places with water gushing in through a variety of cracks, cutouts for pipes, and a host of other imperfections in the old slab.

Upon removing the top IPS layer, an exceptionally large expansion joint about 5 cm wide was uncovered. The architect, as well as the clients, were caught completely unawares and the leakages as well as the unanticipated expansion joints were threatening the feasibility of the site as well as the project completion deadline.

Fig 5: Harvard Business School, Taj Lands’ End Campus

Fig 6: Unanticipated Expansion Joint 5 cm wide on the Terrace above HBS


General Methodology used:

SURFACE PREPARATION
1.Remove all the existing layers of filing on the RCC slab and expose the RCC slab.
2.Clean the RCC surface of all loose particles, dust, cement laitance, etc. Surface preparation is of prime importance as the degree of performance of the coating is directly proportional to the extent of cleaning.
3.After proper cleaning, Identify the construction joints, cracks, honeycombed areas, etc. on the RCC surface and fill the cracks on the RCC surface using Polymer Modified rich mortar prepared by using POLYALK EP.
4.Apply a low viscosity crystalline surface penetrator sealant- SUNFLOWER METALLIC over the cast in situ slabs in three coats
5.Allow the material to penetrate into the slab for sealing the RCC pores.


Fig 7: Surface Preparation and cleaning using air suction device


WATERPROOFING SYSTEM:
1.Provide and apply a primer coat of FLEXIROOF –PU PRIMER on the cleaned RCC slab surface using a soft paintbrush. Shake the container well and directly apply the primer by brush. Allow setting for 30-45 minutes depending on the ambient temperature.
2.After the primer has totally cured and dried, apply FLEXIROOF-PU by brush, roller, or airless spray equipment. Apply at a rate of 1kg/sq.m. for the first coat evenly over the primer surface and allow to cure for 12-24 hours.
3.Extend the coating on the sides of the walls and aluminum glazing frames up to 300mm.
4.After ensuring that the first coat is set and cured, apply the second coat in a similar manner at a rate of 0.5 kg/sqm and allow to cure.
5.While the second coat has reasonably hardened but still wet and tacky on the surface (say after 12 hours), sprinkle sand over the surface to make it rough so as to provide a mechanical key for the protective screen.
6.Allow the two coats of FLEXIROOF-PU to dry for 2-3 days before proceeding with the protective screen.
7.Lay the protective screed over the same in CM 1:4 in average thickness of 10-12mm and cure the same.
8.Admix one pouch of anti-shrinkage admixture- SUNPLEX (330gms pouch) per 50 Kg bag of cement in the protective screed mortar.
9.Provide IPS over the protective screed in the required thickness and slope.


Fig 8: Application of Flexiroof PU – liquid applied, moisture-cured, elastomeric, modified polyurethane membrane

VAPOUR BARRIER COATING:
1.Clean the surface using air blowers BUT ensure that surface is DRY.
2.Mix SUNEPISEAL primer in a plastic container in the ratio of 4 part of Part-A and 1 part of Part-B using a low-speed air-driven stirrer. Mix uniformly to form a brushable consistency.
3.Apply this as a priming coat of SUNEPISEAL 478 coating over the cleaned dry surface using a paintbrush and allow to dry.
4.After the primer has dried apply two coats of SUNEPITOP by mixing in a plastic container in the ratio 4 part of Part-A and 1 part of Part-B using a low-speed air-driven stirrer. Mix uniformly to form a brushable consistency.
5.Apply this coating at 24 hours interval between each coat.
6.Extend the entire application up to 1.0 meters over the sidewalls and aluminum frame.
7.Do not allow foot traffic for the next 48-72 hours till full cured.

Total Views: 196Word Count: 820See All articles From Author

Add Comment

Business Articles

1. Elevate Your Style With Custom Tuxedos From La Rukico – The Best Bespoke Tailor In Nyc
Author: La Rukico Custom Tailor

2. Short Term Loans Uk Direct Lender: The Initial And Final Step In Getting Quick Funding
Author: Helen Clark

3. Factors To Consider When Choosing Nano Ceramic Roofing Tiles In Andhra Pradesh
Author: Danish Fabrication

4. Short Term Loans Uk: Apply Online For A Loan From A Direct Lender
Author: Sarah Ferguson

5. How Appkodes Built Their Own Way To Revolutionize The Airbnb Clone
Author: John Daniel M

6. The Real Deal: What Actually Works For Seo Managers In 2025
Author: Rene

7. Unlocking The Advantages Of E-waste Management Awareness Training
Author: Emma

8. Trimbakeshwar Temple Kaal Sarp Puja | Shree Trimbakeshwar
Author: Rakesh Guruji

9. Mandatory Procedures In Iso 15378 Documents: A Comprehensive Overview
Author: John

10. Concrete Sealers With Corrosion Inhibitors: Enhancing Durability And Longevity
Author: Ivar

11. Top-rated Restroom Cubicles – Installations & Maintenance
Author: super creations

12. Your Trusted Real Estate Agents In Bihar - Bhushan Realtors Pvt. Ltd
Author: Bhushan Realtors

13. Iron Casting Company In India: Aqeel Industries
Author: Aqeel Industries

14. How Many Days Do You Need To Explore Panama? Panama Mission India
Author: Panama Mission india

15. Mg Hector Price In Chennai: A Complete Guide
Author: balaji

Login To Account
Login Email:
Password:
Forgot Password?
New User?
Sign Up Newsletter
Email Address: